Nova-T6 Transfer to SQL hangs
KB25621
KB25621
How useful was this article?
Click on a star to rate it!
Average rating / 5. Vote count:
No votes so far! Be the first to rate this post.
Empl hours = the total hours the staff member is contracted for Load hours = the actual teaching hours they teach (this does not include PPA etc) Eg, if you have a 25 period timetable and the staff member is full time, employed is 25. If they are 0.6 then its 15 (25 x 0.6)…
Click HERE for the Managing Classroom Staff QRS Reviewed on 24/05/2019 How useful was this article? Click on a star to rate it! Submit Rating Average rating / 5. Vote count: No votes so far! Be the first to rate this post.
On the Model screen in Nova-T6, use CTRL and UP or DOWN arrow to change the order of the years. This will correct the order on the Transfer Curriculum screen too. It also changes the order in which the schemes appear in the browse on Curriculum Assignment by Scheme in SIMS .net (though not for…
The problem is caused by the sessions screen not updating with changes to the classes screen. This can be checked on the report – Reports | Cluster/Session mismatches. If such changes are made on the classes screen, the system does not necessarily know what corresponding changes need to be made on the Sessions screen. e.g….
1. Select Data | Alternative Curriculum 2. Click the New button 3. Enter the Prefix, Description and Subject as shown in the following graphic, and deselect the Always Active check box. If the intention was to schedule the unit at all periods of the cycle, then the Always Active check box would be left selected….
The way to double up teachers in SIMS is to go to the class timetable. This can be done via Timetable > New > Group and selecting the year, block and group. This will show you the classes under the group. When you right click the class you can select the option to Add Staff….