Replacing a Teacher in Nova T6
The timetable will be allocated to the new teacher.
The new teacher will have access to all Marksheets owned by the previous member of staff.
Reviewed 31/7/20
The timetable will be allocated to the new teacher.
The new teacher will have access to all Marksheets owned by the previous member of staff.
Reviewed 31/7/20
How useful was this article?
Click on a star to rate it!
Average rating / 5. Vote count:
No votes so far! Be the first to rate this post.
Where staggered lunch periods are required/overlap, it is best to create an extra period. This manages the staggered lunch much better, but will distort any period analysis. On the Cycle screen – choose the lunch periods and give them a green period type Lunch – i.e. not exclusive In Plan | Subjects, create a subject called…
Within Nova T-6 click on Sessions This will show the groups and clusters on the left-hand side of the screen and the sessions on the right- hand side of the screen. Under the Sessions column (on the right hand side) right click on D (for double). This will then automatically change the D to two…
Variations of error in Nova T sgdclash Tdraw celldata sgdtable TdrawCellData sgdstaff TdrawCellData sgdDays TdrawCellData sgdUnits TDrawCellData sgdAttributes TDrawCellData sgdPPATable TDrawCellData Explanation In some instances, the error can be avoided by not having the Year/Band timetable open in the background, or on another monitor (dual monitors), when making changes to the curriculum and timetable. i.e. if…
There might be occasions during the planning of the student curriculum when groups of students need to be transferred from one class to another during the course of the academic year. This is particularly useful if, for example, there are three groups of students attending Expressive Arts classes. At any one time during the academic…
The way to double up teachers in SIMS is to go to the class timetable. This can be done via Timetable > New > Group and selecting the year, block and group. This will show you the classes under the group. When you right click the class you can select the option to Add Staff….
Empl hours = the total hours the staff member is contracted for Load hours = the actual teaching hours they teach (this does not include PPA etc) Eg, if you have a 25 period timetable and the staff member is full time, employed is 25. If they are 0.6 then its 15 (25 x 0.6)…